Skip to content
Sigma EarthPlayground

Playground / Energy and buildings

Rooftop solar payback

Size a rooftop solar system from your roof area and electricity use, estimate what it makes from European Commission sunshine data, and work out how many years it takes to pay back under net metering, net billing or a feed-in tariff.

Free to use Solar sizing and simple investment appraisal (PVGIS 5.3 yields; PM Surya Ghar subsidy rules) Beginner Global Verified credential available
Advertisement

Learning tool. This tool simplifies the official method and uses sample or default data. Do not use its results for business decisions, regulatory filings, assurance, investment or legal compliance. Framework and standard names belong to their owners; Sigma Earth is not affiliated with or endorsed by them. Terms of use

New here? Sample numbers are already filled in, so you can see a full result straight away. Change any number and the result updates by itself; nothing can break. You only need an account to save your work.

How to use this tool · 6 short steps

  1. Look at the sample result: a Delhi family using 350 units a month with a 3 kW system (the result is on the right, or below the steps on a phone).
  2. In step 1 choose the nearest city and the direction the panels face. The yield (what 1 kW makes in a year) fills in by itself.
  3. In step 2 type your roof area and press “Use the suggested size”, or type your own size.
  4. In step 3 choose how your electricity company pays for solar power. Switch from net metering to net billing and watch the saving change.
  5. In step 4 type your price per unit and the installer’s cost per kW. In India, pick the PM Surya Ghar subsidy.
  6. Save, download the CSV or the practice report, then try the graded case.

Sample prices are illustrative values for learning, except the UK price cap and the US average price, which are named in the method table. Use your own bill and a real quote for your own home.

Your rooftop solar, step by step

An example is filled in: a family in Delhi using 350 units a month, with a 3 kW system and the PM Surya Ghar subsidy. Change anything; the result updates as you type.

1. Where is the home, and how much electricity does it use?

How much a panel makes depends on the sunshine where you live. A kW (kilowatt) measures the size of a solar system; a kWh (kilowatt-hour), called a “unit” on Indian bills, measures the electricity it makes or you use.

The city sets the sunshine, the money sign and the grid’s carbon intensity. Choosing a new country fills in sample prices for India, the UK or the US.

“Towards the equator” means south in the northern hemisphere and north in Australia or South Africa. On flat roofs in India panels usually sit on a frame at the best tilt.

kWh per kW a year

Filled in from PVGIS, the European Commission’s free solar map, for the city and direction above. You may type your own figure from PVGIS or the US PVWatts tool. Rule of thumb in India: 1 kW makes about 3.5 to 4.3 units a day (1,300 to 1,570 a year).

%

Put 0 for a roof in full sun all day. A water tank shading part of the panels in the morning might cost 5 to 10%. What does this mean? Installers call 1 minus this share the shade factor.

kWh a month

Look at your last 12 electricity bills and take the average. The sample, 350 units, is an illustrative figure for a family with fans, a fridge and one air conditioner.

2. How big a system fits, and how big should it be?

Two limits decide the size: the shadow-free roof area, and the electricity you use. Bigger is not always better: power you do not use is often paid for at a low export rate.

m²

Measure the open part of the roof, leaving a path round the edge. 1 m² is about 10.8 square feet.

m² per kW

India’s Ministry of New and Renewable Energy (MNRE) uses about 10 m² per kW on flat roofs, where rows are spaced so they do not shade each other. Panels laid flush on a sloping roof need about 5 to 6 m² per kW.

kW

The sample is 3 kW: the largest size the Indian PM Surya Ghar subsidy pays for. Installers sell sizes in steps, such as 2, 3 or 5 kW.

A roof fits 4 kW, but the home’s yearly use needs only about 2.7 kW. Under net metering with a low rate for surplus power, which size is likely to pay back fastest?

3. How is the solar power paid for?

Your electricity company (in India, the DISCOM) decides how solar power is counted. This changes the saving more than most people expect.

India: net metering for homes, set by your state commission. UK: Smart Export Guarantee (an export tariff). US: depends on the state; California moved homes to net billing in 2023.

%

Called self-consumption. Homes empty during the day use maybe a quarter to a half; a battery or daytime use raises it. The sample 40% is illustrative. It matters most under net billing.

₹ per kWh

Under net metering this rate applies only to the surplus above your yearly use. In India the surplus is usually settled at a low rate set by the state commission; the sample ₹3 is illustrative. In the UK, Smart Export Guarantee rates are set by each supplier.

Under net metering, a family starts using more of its solar power at midday (from 30% to 60%). Its yearly generation stays below its yearly use. What happens to its yearly saving?

4. What does it cost, and what does each unit save?

₹ per kWh

Use the energy charge of your highest slab on the bill, because solar removes your top units first. Leave out fixed charges: solar does not change them. The sample ₹7.50 is illustrative. UK default tariff cap, October to December 2026: £0.2632.

₹ per kW

From an installer’s quote, including panels, inverter, frame, wiring and the meter. The sample ₹60,000 a kW is illustrative. Divide a quote by its size: ₹180,000 for 3 kW is ₹60,000 a kW.

Special-category states and union territories: the north-east, Uttarakhand, Himachal Pradesh, Jammu and Kashmir, Ladakh, Andaman and Nicobar, and Lakshadweep.

More options: upkeep, inverter, ageing and prices
% of cost a year

Illustrative 1%. Panels need regular cleaning where it is dusty.

₹

The inverter turns the panels’ direct current into household power; it usually lasts less long than the panels. Illustrative value. Put 0 to leave it out.

year

Many inverters carry 5 to 10 year warranties; 12 is an illustrative choice.

% a year

Illustrative 2%. Type 0 to keep prices flat; a negative value means prices fall.

% a year

The US National Renewable Energy Laboratory (NREL) found a median loss of 0.75% a year across US systems (higher in hot climates, about 0.88%).

% a year

What money could earn elsewhere, for example a fixed deposit. Used only for the net present value and levelised cost. Illustrative 8%.

Advertisement

Quick facts

What it teaches
Solar sizing and simple investment appraisal (PVGIS 5.3 yields; PM Surya Ghar subsidy rules)
Level
Beginner · no prior experience needed to try it
Where it applies
Global
Cost
Free to use. Optional verified credential after you pass the graded case: US$10, or ₹999 in India
Last checked
November 2026, against the official sources listed below
Use
Learning and practice only, not for real reporting

About rooftop solar sizing and payback

A rooftop solar system is sized in kilowatts peak (kWp, or kW): its output in full sun. What it makes in a year depends on the sunshine, the direction and tilt of the panels, shade and losses in wiring and the inverter. This tool takes the yearly yield (kWh made by 1 kW) from PVGIS 5.3, the free solar calculator of the European Commission’s Joint Research Centre, which covers most of the world.

Payback is the number of years before the savings equal the cost. The simple payback divides the cost by the first year’s saving. A fuller appraisal adds what changes over time: panels slowly lose output, power prices rise, and the inverter usually needs replacing once. It also gives the net present value (NPV: what the whole life is worth today) and the levelised cost of electricity (LCOE: the cost of each solar unit over the system’s life).

How the power is paid for matters as much as the sunshine. Net metering nets exports against imports, so each solar unit is worth the full price up to your yearly use. Net billing or an export tariff pays exports a lower rate, so using power at the moment it is made is worth more.

Rules in force, November 2026: in India, homes get central financial assistance under PM Surya Ghar Muft Bijli Yojana (₹30,000 a kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000; higher in special-category states), for systems using domestically made modules and cells; the scheme targets one crore homes by 2026-27. Net metering is set by each state commission. In March 2026 the Ministry of Power published draft amendments to these rules covering rooftop solar billing; they had not been notified as final when this tool was checked. In the United States the 30% federal home solar credit (section 25D) ended for systems finished after 31 December 2025. In the UK, home solar panels carry 0% VAT until 31 March 2027, then 5%.

What this tool leaves out: batteries, loans and interest, tax, time-of-day tariffs, hourly matching of use and output, and site surveys. It is a learning estimate, not a quote.

How this is calculated

Worked numbers use the sample: Delhi, 350 kWh a month, 3 kW, net metering, ₹7.50 a unit, ₹3 for surplus, ₹60,000 a kW, PM Surya Ghar general rate.

StepFormulaValue usedSource
YieldkWh made by 1 kW in a year at the city and direction chosenDelhi, best tilt 32° facing south: 1,554 kWh per kW (east/west 1,325; flat 1,369)PVGIS 5.3, EU Joint Research Centre: crystalline silicon, building-mounted, 14% system losses, long-term average; runs made 29 November 2026
Size limitsRoof limit = roof area ÷ area per kW. Use limit = yearly use ÷ (yield × (1 − shade)). Sample: 40 ÷ 10 = 4 kW; 4,200 ÷ 1,554 = 2.7 kWAbout 10 m² of shadow-free roof per kW on flat roofsMNRE rooftop solar guidance (about 10 m² per kW)
GenerationkW × yield × (1 − shade), then × (1 − degradation) each later year. Sample: 3 × 1,554 = 4,662 kWhPanels lose 0.75% a yearNREL PV Fleet study: median 0.75% a year
Value under net meteringmin(generation, use) × price + surplus × export rate. Sample: 4,200 × 7.50 + 462 × 3 = ₹32,886Self-use share does not change itElectricity (Rights of Consumers) Rules and state commission regulations
Value under net billing / grossNet billing: self-used × price + exported × export rate. Gross: generation × feed-in rateSelf-use share (sample 40%) is illustrativeUK Smart Export Guarantee and US state net billing as examples
Subsidy (India)₹30,000 × min(kW, 2) + ₹18,000 × (min(kW, 3) − 2). Sample 3 kW: ₹78,000Special-category states: ₹33,000 and ₹19,800MNRE, PM Surya Ghar Muft Bijli Yojana
Simple paybackCost after subsidy ÷ (year-1 saving − upkeep). Sample: 102,000 ÷ (32,886 − 1,800) = 3.3 yearsUpkeep 1% of cost a year (illustrative)Standard appraisal method
Cash-flow payback, NPV, LCOERunning total of yearly saving − upkeep − inverter, from minus the cost; NPV discounts each year; LCOE = (cost + discounted upkeep) ÷ discounted kWhPrices +2% a year, discount 8%, inverter in year 12 (all illustrative)Standard discounted cash flow
Avoided CO₂ekWh × (grid intensity − 41 g) ÷ 1,000,000 = tonnes. Sample: 4,662 × 624.7 ÷ 10⁶ = 2.9 tIndia 665.7, UK 218.0, US 384.4 g CO₂e per kWh (2025, life-cycle); rooftop PV 41 gEmber yearly electricity data (release of 17 November 2026); IPCC AR5 WGIII Annex III
Sample pricesTyped in step 4UK £0.2632 a unit (Ofgem cap, Oct–Dec 2026, VAT-free); US $0.182 (EIA 2026 average outlook); all other prices and costs illustrativeOfgem; US Energy Information Administration Short-Term Energy Outlook
Graded case

Prove you can apply it

Size a rooftop system for a fictional household, estimate its generation, value it under the right metering rules and subsidy, and work out the payback and avoided carbon.

  • New numbers on every attempt
  • Answers checked against a tolerance
  • Up to 10 attempts a day, all free
Start the graded case
Verified learning credential US$10 ₹999 in India Public verification page, PDF with QR code, and a LinkedIn add. Pay only after you pass. A learning credential, not a professional certification.

Sources and rules used

Checked against the sources below in November 2026. Rules change: always use the official text for real work.

Questions about this tool

How do I work out the payback of rooftop solar?

Divide the cost after any subsidy by the yearly saving minus upkeep. That is the simple payback. For a fuller answer, add panel ageing, price rises and an inverter replacement year by year, and find the year the running total turns positive.

How many units does 1 kW of solar make in a year?

It depends on the sunshine and the direction of the panels. In most Indian cities PVGIS gives about 1,300 to 1,600 kWh a year for 1 kW facing south, roughly 4 units a day. In London it is about 990 kWh, in Phoenix about 1,740 kWh.

Should I install a bigger system than my yearly use?

Usually not, under net metering or net billing. Units above your use earn only the export rate, which is often far below what you pay, so the extra panels take longer to pay back.

What is the PM Surya Ghar subsidy?

India’s central financial assistance for home rooftop solar: ₹30,000 a kW for the first 2 kW and ₹18,000 for the third kW, up to ₹78,000. Special-category states get ₹33,000 and ₹19,800. Larger systems get no more. Apply through the national portal with a registered vendor.

Is there still a US federal tax credit for home solar?

No. The 30% residential clean energy credit (section 25D) ended for systems finished after 31 December 2025, under the 2025 budget law. Some states and utilities still offer their own incentives.

What is the difference between net metering and net billing?

Net metering counts each unit you export against a unit you buy, so it is worth the full price. Net billing pays exports a separate, usually lower rate, so a unit used at home as it is made is worth more than a unit exported.

Do I need an account?

No. You need a free account only to save results or take the graded case.

Can I use this tool for my company’s reporting?

No. The Playground is for learning only. It simplifies the official methods and uses sample data, so its results must not be used for business decisions, regulatory filings, assurance or investment. Use the official standard and qualified advice for real work.