Practise India’s Carbon Credit Trading Scheme: count a plant’s emissions, divide by its output to get its emission intensity, compare it with the notified target, and see how many carbon credit certificates it earns or must surrender.
Learning tool. This tool simplifies the official method and uses sample or default data. Do not use its results for business decisions, regulatory filings, assurance, investment or legal compliance. Framework and standard names belong to their owners; Sigma Earth is not affiliated with or endorsed by them. Terms of use
New here? Sample numbers are already filled in, so you can see a full result straight away. Change any number and the result updates by itself; nothing can break. You only need an account to save your work.
All plant figures and targets in the sample are made up. A real plant’s targets are in the Schedule of the Target Rules.
A fictional cement plant is filled in so you can see a result straight away. Go through the four steps and change any number. Results update as you type.
India’s Carbon Credit Trading Scheme (CCTS) was notified on 28 June 2023 under the Energy Conservation Act, 2001 and amended in December 2023. It sets up the Indian Carbon Market with two parts: a compliance mechanism for energy-intensive industry and a voluntary offset mechanism. The Bureau of Energy Efficiency (BEE) runs it; the Central Electricity Regulatory Commission (CERC) regulates trading; Grid Controller of India (Grid-India) keeps the registry.
Under the compliance mechanism each plant gets a target for its greenhouse gas emission intensity (GEI), in t CO₂e per tonne of equivalent product, against its own FY 2023-24 baseline. Beat it and BEE issues Carbon Credit Certificates (CCCs), 1 per tonne; miss it and the plant must surrender CCCs, bought on a power exchange if it has none banked.
Grid electricity factor: BEE’s procedure says to use the latest Central Electricity Authority (CEA) average. CEA’s CO₂ Baseline Database v22.0 (August 2026) gives 0.727 t CO₂/MWh for FY 2023-24 (the baseline year), 0.710 for FY 2024-25 and 0.675 for FY 2025-26. The sample uses 0.727; the result shows what 0.675 would give.
What this tool leaves out: sector-specific normalisation and equivalent-product rules, purchased heat, kiln-dust corrections, verification and the offset mechanism. BEE’s procedure also lists methane and nitrous oxide factors for fuels; this tool leaves them out (for coal they add under 1% of the CO₂). It uses IPCC default fuel factors; a real plant uses measured values where BEE requires them.
BEE’s Detailed Procedure adds up emissions inside the plant gate (fuel burned + process reactions + purchased electricity − electricity exported), divides by output, and compares the result with the target. Worked numbers use the sample cement plant in FY 2026-27. BEE’s procedure also lists methane and nitrous oxide factors for fuels; this tool leaves them out (for coal they add under 1% of the CO₂).
| Step | Formula | Value or factor | Source |
|---|---|---|---|
| Fuel burned | t × NCV (kcal/kg) × 1,000 × 4.1868×10⁻⁹ TJ/kcal × CO₂ factor × oxidation factor 1. Sample pet coke: 75,000 × 8,000 × 4.1868×10⁻⁶ × 97.5 = 244,928 t | Other bituminous coal 94.6, sub-bituminous coal 96.1, lignite 101.0, pet coke 97.5, furnace oil 77.4, diesel 74.1, natural gas 56.1, LPG 63.1 t CO₂/TJ | IPCC 2006 Guidelines, Vol. 2, ch. 1, Table 1.4 (the default “Type I” factors BEE’s procedure points to) |
| Clinker (cement process) | clinker × (CaO share × 44.01/56.08 + MgO share × 44.01/40.30). Sample: 0.65 × 0.7848 + 0.015 × 1.0921 = 0.5265 t CO₂/t; × 1,400,000 t = 737,076 t | Molar masses of CO₂, CaO and MgO. BEE’s text prints 40.34 for MgO; the molar mass of MgO is 40.30. The difference is under 0.01%. | BEE Detailed Procedure, Annexure II, output-based method (kiln-dust correction left out) |
| PFCs (aluminium smelting) | kg CF₄ × GWP + kg C₂F₆ × GWP, ÷ 1,000 | AR2: CF₄ 6,500, C₂F₆ 9,200 (AR6: 7,380 and 12,400) | BEE Detailed Procedure, Annexure I; IPCC AR6 |
| Grid electricity | MWh × grid factor. Sample: 110,000 × 0.727 = 79,970 t | CEA v22.0 (August 2026): 0.727 for FY 2023-24 (the baseline year, used in the sample), 0.710 for FY 2024-25, 0.675 for FY 2025-26 t CO₂/MWh. BEE says to use the latest CEA average: at 0.675 the sample is 74,250 t (5,720 t less) | CEA CO₂ Baseline Database v22.0; BEE Detailed Procedure |
| Renewable power, RECs, biomass, exports | Proven renewable use × 0; RECs not counted; biomass CO₂ reported separately; exported power × its factor subtracted | Sample: 40,000 MWh renewable at zero; 10,000 RECs ignored; 10,048 t biogenic CO₂ (memo) | BEE Detailed Procedure, sections 3.4 and 4 |
| Intensity (GEI) | total ÷ equivalent output. Sample: 1,198,547 ÷ 2,000,000 = 0.5993 t CO₂e/t | Sample targets 0.6017 (FY 2025-26) and 0.5893 (FY 2026-27) are illustrative. For scale, one aluminium smelter in the Schedule has a baseline of 13.8878 and a FY 2025-26 target of 13.7232 t CO₂e/t (a 1.19% cut) | Target Rules 2025, Schedule |
| Certificates | (target − achieved) × output: + = issued, − = to surrender. Sample: (0.5893 − 0.599273) × 2,000,000 = −19,947 | 1 CCC = 1 t CO₂e; banked CCCs used first (none can exist in FY 2025-26, the first compliance year) | BEE Detailed Procedure, sections 2, 7 and 9 |
| Environmental compensation | 2 × average CCC trading price × certificates not surrendered. Sample: 2 × ₹800 × 14,947 = ₹2.39 crore | The ₹800 price is illustrative: we found no published CCC trade or price band as of November 2026 | Target Rules 2025 (imposed by the Central Pollution Control Board, payable within 90 days) |
Work out a fictional plant’s emissions, its emission intensity and its carbon credit position under India’s CCTS, including banking and the penalty for missing certificates.
Checked against the sources below in November 2026. Rules change: always use the official text for real work.
Certificates = (target GEI − achieved GEI) × the plant’s equivalent output for the year. A positive answer is the number of certificates BEE issues; a negative answer is the number the plant must surrender. One certificate equals one tonne of CO₂e.
Greenhouse gas emission intensity: the plant’s counted emissions in tonnes of CO₂e divided by its output, for example t CO₂e per tonne of cement. Targets are set as GEI, so a plant can grow output and still comply if each tonne is made with fewer emissions.
No. BEE’s procedure says buying RECs is not a claim to renewable energy under the scheme. Renewable power counts as zero only when the plant actually uses it (on site, open access, a dedicated agreement or a green tariff) and can prove it with contracts.
The Central Pollution Control Board can impose environmental compensation of twice the average price at which certificates traded in that compliance year’s trading cycle, payable within 90 days, after giving the plant a hearing.
Yes. Certificates left after a compliance year can be banked. Ones a plant was issued can later be sold or used; ones it bought may only be used for its own compliance. FY 2025-26 is the first compliance year, so banked certificates can only exist from FY 2026-27.
We found no published CCC trade or price band as of November 2026. The trading rules (CERC, February 2026) and the registry portal (March 2026) exist, and on 29 November 2026 the Indian Energy Exchange was still inviting comments on introducing its CCC segment. That is why the price in this tool is illustrative.
BEE’s procedure says to use the latest Central Electricity Authority average. CEA’s database v22.0 (August 2026) gives 0.727 t CO₂/MWh for FY 2023-24, 0.710 for FY 2024-25 and 0.675 for FY 2025-26. This tool’s sample uses the baseline-year 0.727 and shows the 0.675 result for comparison; use the value BEE applies to the plant.
No. You need a free account only to save results or take the graded case.