Run a fictional kitchenware maker from 2026 to 2030: choose efficiency, solar, heat pumps, green power contracts or carbon credits each year, then see whether you hit a 1.5 °C pathway, stayed in budget, made money and kept your product claims honest.
Learning tool. This tool simplifies the official method and uses sample or default data. Do not use its results for business decisions, regulatory filings, assurance, investment or legal compliance. Framework and standard names belong to their owners; Sigma Earth is not affiliated with or endorsed by them. Terms of use
New here? Sample numbers are already filled in, so you can see a full result straight away. Change any number and the result updates by itself; nothing can break. You only need an account to save your work.
There is no single right plan. Good plans start with cheap measures, spread big spending over the years and never rely on carbon credits to look greener.
You run a fictional kitchenware maker for five years (2026 to 2030). Each year you choose what to invest in. A sample plan is filled in so you see a result straight away; press “Clear the sample plan” at the end of step 1 (or in the result panel) to play from scratch.
This game is a business simulation: you play the leadership of a fictional company and make the kind of decisions found in a climate transition plan, the plan a company publishes to show how it will cut emissions while staying profitable. The guidance most used for such plans is the Transition Plan Taskforce (TPT) Disclosure Framework (October 2023), whose materials the IFRS Foundation took over in 2024 as educational material for the ISSB’s climate standard, IFRS S2. IFRS S2 asks for information about any transition plan a company has; it does not require one.
The numbers follow real methods:
What is illustrative: every cost, saving, price and budget in the game, and the measure sizes, are invented for learning, not market data. Carbon prices really do vary widely: the World Bank counted an average of about US$21 a tonne across carbon pricing schemes in 2026, while EU allowances traded at about €86–90 in November 2026.
What the game leaves out: Scope 3, growth in production, a grid that gets cleaner over time, residual-mix factors, taxes, depreciation, and value after 2030 (so long-lived investments look worse than they are).
Each investment works from the year it is made, for the rest of the game. Worked numbers use the sample company in India in 2030 with every measure installed and a 50% renewable contract.
| Item | Formula | Factor or value | Source |
|---|---|---|---|
| Scope 1 (natural gas) | gas MWh × 0.18442. Sample 2030: 10,000 × (1 − 0.12 − 0.30) = 5,800 MWh × 0.18442 = 1,069.6 t | 0.18442 t CO₂e per MWh (gross calorific value), natural gas 100% mineral blend | UK DESNZ GHG conversion factors 2026 |
| Electricity bought | base × (1 − 0.08 if LED) + heat pump electricity − solar output, never below 0. Sample: 6,000 × 0.92 + 850 − 1,500 = 4,870 MWh | Solar: 1,000 kW × yield (India 1,500, UK 950, US 1,400, other 1,300 kWh per kW a year) | Illustrative typical yields; check a real site with the Global Solar Atlas |
| Heat pump electricity | gas replaced × 0.85 ÷ 3. Sample: 3,000 × 0.85 ÷ 3 = 850 MWh | Replaces 30% of base gas; boiler efficiency 85%; coefficient of performance (COP) 3 | Illustrative values for learning |
| Scope 2, location-based | electricity bought × grid factor. Sample: 4,870 × 0.675 = 3,287.3 t | India 0.675 t CO₂ per MWh (FY 2025-26); UK 0.13096; US 0.3497 | CEA CO₂ Baseline Database v22.0; DESNZ 2026; EPA eGRID2023 |
| Scope 2, market-based | electricity bought × (1 − contract share) × grid factor. Sample: 4,870 × 0.5 × 0.675 = 1,643.6 t | The rest uses the grid average (no residual mix), a simplification | GHG Protocol Scope 2 Guidance (2015) |
| Pathway ceiling | base-year Scope 1 + 2 × (1 − 0.042 × years since 2025). Sample 2030: 5,894.2 × 0.79 = 4,656.4 t | 4.2% a year minimum linear reduction for 1.5 °C | SBTi Corporate Net-Zero Standard V1.3 criteria |
| Carbon cost | Scope 1 × carbon price that year. Sample 2026: price 50, rising 10 a year | Illustrative price path; set 0 if none applies | Illustrative |
| Payback and cost per tonne | payback = cost ÷ yearly energy saving; cost per tonne = (cost × CRF − saving) ÷ tonnes cut, CRF = r(1+r)ⁿ ÷ ((1+r)ⁿ − 1) | Lives: LED 10, heat recovery 15, solar 25, heat pump 15 years | Standard investment appraisal (capital recovery factor) |
| Net present value (NPV) | Σ (cash with your plan − cash doing nothing) ÷ (1 + r)ʸ for y = 1 to 5 | Cash = profit before energy and carbon − energy − carbon − credits − investment | Standard discounting; only 2026 to 2030 counted |
Check a fictional manufacturer’s five-year plan: its emissions both ways, the 2030 pathway ceiling, solar payback, a heat pump on its grid, the carbon cost, cost per tonne, carbon credits and honest claims.
Checked against the sources below in November 2026. Rules change: always use the official text for real work.
It is a company’s plan for cutting its emissions in line with its climate targets while keeping the business healthy: which actions, when, what they cost and who oversees them. The TPT Disclosure Framework groups it into foundations, implementation, engagement, metrics and targets, and governance, which is how this game’s report is set out.
Under the GHG Protocol, credits bought from projects elsewhere are reported separately from the inventory and never subtracted from Scope 1 or 2. Science-based targets also have to be met by cutting your own emissions. Credits can support climate action, but they cannot replace cuts.
Not on products sold to consumers in the EU if the claim rests on offsetting: Directive (EU) 2024/825 has banned that since 27 September 2026. A product climate claim must be based on the product’s actual life-cycle impact. Other countries have their own rules on misleading claims.
Location-based Scope 2 uses the average emission rate of the grid you actually draw power from, which a contract does not change. Market-based Scope 2 reflects what you bought by contract, so certificates and green power agreements lower it. Report both figures.
The game counts only five years. Solar panels and heat pumps last 15 to 25 years, so much of their saving comes after 2030. The menu’s payback and cost per tonne, worked out over each measure’s life, show their full value.
No. You need a free account only to save results or take the graded case.
No. The Playground is for learning only. It simplifies the official methods and uses sample data, so its results must not be used for business decisions, regulatory filings, assurance or investment. Use the official standard and qualified advice for real work.